Building · consolidated indicators
HVAC Compliance
Period
84%
Weighted average · 9 floors
▲ +3% vs prev period
Energy
Period
46.2 MWh
Total building consumption
▼ −2.1% vs prev period
Active alarms
Live
6
2 critical · 4 warnings
▲ +3 vs yesterday
Floors online
Live
9/9
Full connectivity
— no change
Operational continuity
Live
92%
11 of 12 critical points ready · backup ~36 h
▼ −1 CRAC-2 in maintenance · 3 devices offline
Building floors
Click a floor to see detail
Live
| Floor |
Use |
Equipment |
HVAC compliance |
Energy (period) |
Alarms |
Status |
| Machine Room |
Central chiller plant |
2 chillers · 9 pumps · 2 towers |
94% |
12.4 MWh |
3 |
Attention |
| Floor 1 |
Branch + offices |
VAV · AHUs · meters |
78% |
5.1 MWh |
1 |
Attention |
| Floor 2 |
Offices |
VAV · 8 fancoils · AHUs · meters |
85% |
4.7 MWh |
— |
OK |
| Floor 3 |
Offices |
8 fancoils · meters |
88% |
3.9 MWh |
— |
OK |
| Floor 4 |
Offices |
8 fancoils · meters |
91% |
3.7 MWh |
— |
OK |
| Floor 5 |
Offices |
8 fancoils · meters |
80% |
4.2 MWh |
1 |
Attention |
| Floor 6 |
Offices |
8 fancoils · meters |
89% |
3.8 MWh |
— |
OK |
| Floor 7 |
Offices |
8 fancoils · meters |
86% |
4.0 MWh |
— |
OK |
| Floor 8 |
Offices |
8 fancoils · meters |
76% |
4.4 MWh |
1 |
Attention |
Benchmarking HVAC compliance
Floors ranked by % thermal compliance for the period
Period
| Floor | Compliance | Bar |
| Machine Room | 94% | |
| Floor 4 | 91% | |
| Floor 6 | 89% | |
| Floor 3 | 88% | |
| Floor 7 | 86% | |
| Floor 2 | 85% | |
| Floor 5 | 80% | |
| Floor 1 | 78% | |
| Floor 8 | 76% | |
Benchmarking Energy · absolute consumption
MWh consumed in the period by floor
Period
| Floor | MWh | Barra |
| Machine Room | 12.4 | |
| Floor 1 | 5.1 | |
| Floor 2 | 4.7 | |
| Floor 8 | 4.4 | |
| Floor 5 | 4.2 | |
| Floor 7 | 4.0 | |
| Floor 3 | 3.9 | |
| Floor 6 | 3.8 | |
| Floor 4 | 3.7 | |
HVAC · building consolidated
Temp compliancePeriod
84%
Weighted average · 9 floors
▲ +3% vs prev
Setpoint adherencePeriod
92%
SP within allowed band
— no change
Average runtimePeriod
9.4 h/day
Per building HVAC unit
▲ +0.3 h vs prev
Equipment in MANUALLive
4/83
83 HVAC units with selector
2 in MR · 1 in F1 · 1 in F2
HVAC by floor
Compliance and runtime detail by floor · click to see floor detail
Period
| Floor |
HVAC units |
Compliance |
Setpoint adh. |
Avg runtime |
Status |
| Machine Room |
2 chillers · 9 pumps · 2 towers |
94% |
N/A |
14.2 h/day |
2 in MAN |
| Floor 1 |
VAV · AHUs |
78% |
88% |
10.1 h/day |
Attention |
| Floor 2 |
VAV · 8 fancoils · AHUs |
85% |
91% |
9.6 h/day |
1 in MAN |
| Floor 3 | 8 fancoils | 88% | 94% | 9.2 h/day | OK |
| Floor 4 | 8 fancoils | 91% | 95% | 8.9 h/day | OK |
| Floor 5 | 8 fancoils | 80% | 89% | 10.4 h/day | Attention |
| Floor 6 | 8 fancoils | 89% | 93% | 9.0 h/day | OK |
| Floor 7 | 8 fancoils | 86% | 92% | 9.3 h/day | OK |
| Floor 8 | 8 fancoils | 76% | 86% | 11.7 h/day | Below band |
Compliance distribution
How many floors fall in each band
Period
| Band | Floors | Distribution |
| ≥ 90% | 2 | |
| 85–90% | 4 | |
| 80–85% | 2 | |
| < 80% | 1 | |
Top units with problems
Units with active thermal fault or ΔT/setpoint out of band
Live
| Unit | Floor | Issue |
| CWP 2 | Machine Room | Fault active |
| Tower 2 | Machine Room | ΔT-LOW |
| Fancoil 3 | Floor 5 | SP out of band |
| Fancoil 7 | Floor 8 | Runtime > 12h |
| CWP 2 | Machine Room | Selector in MAN |
| AHU 1 | Floor 2 | Selector in MAN |
💡
Lighting — not applicable to Corporate HQ
This building has no BMS-managed lighting control. The tab is kept for consistency with the Keedian standard pattern and remains available for future buildings that do have it.
Energy · building consolidated
Total consumptionPeriod
46.2 MWh
Sum of the 9 floors
▼ −2.1% vs prev
Peak demandPeriod
142 kW
May 14 · 14:30 (Tuesday)
▲ +4 kW vs prev peak
Estimated costPeriod
CLP$ 4,8M
Average tariff + demand charges
▼ −CLP$ 96k vs prev
IntensityPeriod
62.4 kWh/m²
Annualized · usable floor area
— no change
Consumption by floor
Sorted by absolute consumption for the period · click to see floor detail
Period
Monthly trend
Total building consumption · last 12 months (MWh)
Trend
Summer (Dec-Feb) peaks from heavy chiller use · Mild winter from lower cooling demand
Estimated attribution by system
Consumption breakdown for the period · 🟡 estimate (no sub-metering by system)
Period
HVAC (chillers + pumps + fancoils + AHUs)30.6 MWh · 66%
Lighting + Plug load (estimated)13.0 MWh · 28%
Other (UPS, elevators, etc.)2.6 MWh · 6%
🟡 Estimated attribution. Per-system precision requires electrical sub-metering on each building feeder.
Operational continuity · read-only — monitoring the readiness of backup systems: the question is not "is it broken now?" but "when the grid fails, will the backup pick up the load and for how long?". Sources: UPS via SNMP · generator/ATS/panels via Modbus · critical rooms via BMS. Targets are configurable examples.
Continuity posture · building
Continuity posture
Live
92%
11 of 12 critical points ready + redundant
▼ −1 vs yesterday
Backup autonomy
Live
~36 h
UPS 8 min → generator ~36 h at full load
— no change
Devices online
Live
142/145
3 offline · 1 controller, 2 sensors
▼ −3 vs hace 1 h
Events (period)
Period
2
2 grid outages absorbed
0 backup failures
Electrical backup · Level 1
Electrical backup systems
Status, autonomy and readiness of each link in the power chain
Live
| System |
Status |
Autonomy / Capacity |
Readiness |
Status |
| UPS — data center & comms |
Online (on grid) |
8 min @ 42% load |
Batteries OK · discharge test Apr 12 |
Operational |
| Generator set |
Standby (in AUTO) |
~36 h at full load · fuel 78% |
Test Jul 01: start 8 s, took load ✓ |
Ready |
| ATS — automatic transfer |
Normal (Grid position) |
Transfer < 10 s |
AUTO mode · simulation Jul 01 ✓ |
Auto |
| Main switchboard — dual feed |
Both feeds active |
Load 61% · phase balance OK |
N+1 available |
Redundant |
UPS · battery health
Live
OK
VRLA bank · 2.5 years · temperature 24 °C
Discharge test Apr 12: capacity 96% · 8 min at current load
Generator · start readiness
Live
Ready
In AUTO · start battery 13.1 V · preheated · fuel 78%
Last test Jul 01: started in 8 s and took load ✓
Critical environment · Level 2
Critical room cooling
Live
Partial N+1
Data center: N+1 OK · comms: CRAC-2 under maintenance
Chilled water stable · rooms within band
Leak detection
Live
Dry
6 sensors · data center, UPS room, pump room
— no events in the period
Rooms within band
Live
4/4
Temperature and RH within target
— no excursions
Critical rooms
Environment and cooling of the spaces hosting critical loads
Live
| Room |
Temp |
RH |
Leak |
Cooling |
Status |
| Data center |
22.1 °C |
45% |
Dry |
CRAC-1 · N+1 available |
OK |
| Comms room |
23.4 °C |
48% |
Dry |
CRAC-2 under maintenance |
No N+1 |
| UPS room |
24.0 °C |
42% |
Dry |
Forced ventilation |
OK |
| Pump room |
26.8 °C |
— |
Dry |
Natural ventilation |
OK |
Monitoring connectivity
Online and operationalLive
138
of 145 devices · reporting and operating
28/28 critical OK
Online, not operationalLive
4
reporting but stopped / in fault / maintenance
0 critical
OfflineLive
3
blind · 1 controller, 2 sensors
0 critical offline
Connectivity by specialty and criticality
Where and how severe — the critical-affected column is the one that triggers continuity
Live
| Specialty |
Devices |
Online |
Not operational |
Offline |
Critical affected |
| Climate (HVAC) |
78 |
77 |
1 |
1 |
0 |
| Lighting |
24 |
24 |
2 |
0 |
0 |
| Vertical transport |
4 |
4 |
1 |
0 |
0 |
| Electrical / UPS |
15 |
15 |
0 |
0 |
0 |
| Environment / sensors |
24 |
22 |
0 |
2 |
0 |
Critical / Non-Critical configurable per building · Non-Critical = anything not marked critical. State from last_telemetry_ts (offline) + run-status/fault (not operational). Base tier — raw device data.
Gateways and devices
What is reporting and what is blind — a downed gateway drags down its branch of devices
Live
| Device / group |
Type |
Last reading |
Online |
Status |
| Primary BMS gateway |
Gateway (Modbus/BACnet → TB) |
3 s ago |
— |
Online |
| Backup BMS gateway |
Gateway (hot-standby) |
3 s ago |
— |
Online |
| Chiller plant controllers |
Modbus controller (chillers/towers/pumps) |
5 s ago |
12 / 12 |
Online |
| Per-floor meters |
Modbus meter (feeder) |
15 s ago |
9 / 9 |
Online |
| Data center UPS |
SNMP (UPS-MIB) |
10 s ago |
1 / 1 |
Online |
| Fancoil / AHU controllers |
Modbus controller (terminal) |
8 s ago |
63 / 64 |
1 offline · Fancoil F8 |
| Temp / RH / leak sensors |
Sensor (BMS) |
20 s ago |
55 / 57 |
2 offline · pump room leak |
State from freshness of the last reading (last_telemetry_ts). Online threshold configurable (e.g. 2–5 min) based on polling interval. Raw device data — base tier.
Equipment to check · offline and not operational
The concrete list behind the counts — critical first, then by elapsed time
Live
| Device |
Specialty |
Criticality |
Status |
Since |
Impact |
| Fancoil F8-06 (controller) |
Climate |
Non-critical |
Offline |
42 min ago |
Floor 8 · zone with no visible terminal control |
| Leak sensor · pump room #1 |
Environment |
Non-critical |
Offline |
1 h 15 min ago |
No leak detection at that point |
| Leak sensor · pump room #2 |
Environment |
Non-critical |
Offline |
1 h 15 min ago |
No leak detection at that point |
| Elevator #3 |
Vertical transport |
Non-critical |
Not operational |
since 08:00 |
Scheduled maintenance · reduced transport capacity |
| Fancoil F3-04 |
Climate |
Non-critical |
Not operational |
3 h ago |
F3 office zone without climate (equipment stopped) |
| Lighting circuit · F6 north wing |
Lighting |
Non-critical |
Not operational |
25 min ago |
Driver fault · zone without scheduled lighting |
| Lighting circuit · F2 |
Lighting |
Non-critical |
Not operational |
10 min ago |
Outside schedule (check programming) |
7 devices (3 offline + 4 not operational) · 0 critical. Order and impact configurable. "Since" = last_telemetry_ts (offline) or run-status/fault transition (not operational).