Overview
Cooling Production 11
Distribution 3
Operation · Alarms 3
!
3 active out-of-range conditions
1 critical · 2 warnings — click to view detail
→
ΔT Chillers
6.3°C
Average
86%
Compliance
Band 5–7 °C
▲ +0.2 °C vs prev. 30d
ΔT Towers
3.5°C
Average
71%
Compliance
Band 4–6 °C
▼ −0.4 °C vs prev. 30d
Operational Compliance
94%
Score
5/6
Seq. OK
Target ≥ 95%
▲ +2% vs prev. 30d
Diagnostic Matrix
Chiller ΔT OK
Chiller ΔT Low
Tower OK
System Optimal
67%
Hydraulic Issue
10%
Tower Low
Rejection Issue
8%
Chiller Issue
15%
67% in optimal state.
The remaining 33% is concentrated in combined chiller issues (15%), which suggests reviewing building thermal load or condenser flow.
Operating Sequences
01
Chiller → CP Pump
100%
02
Chiller → CC Pump
99%
03
Chiller → Tower
94%
04
CP → CS (distribution)
98%
05
Tower → CC
100%
06
System OFF Consistency
87%
Monthly evolution · last 12 months
ΔT Chillers monthly avg.
JunJulAugSepOctNovDecJanFebMarAprMay
ΔT Towers monthly avg.
JunJulAugSepOctNovDecJanFebMarAprMay
Op. Compliance monthly
JunJulAugSepOctNovDecJanFebMarAprMay
Operation pattern · day × hour
Heatmap · plant active
0%
100%
Hover over cell for detail
ΔT Chillers
6.3°C
Average
86%
Compliance
Band 5–7 °C
▲ +0.2 vs prev period
ΔT Towers
3.5°C
Average
71%
Compliance
Band 4–6 °C
▼ −0.4 vs prev period
Plant op. hours
624h
Combined
87%
of the period
30 days · 720h max
▲ +24h vs prev. period
Equipment in MANUAL
2/11
Current
91%
Auto in period
PMP 2 CC · CT 2
▼ −3% vs prev. period
Production cycle · flow
CP Pumps
2/3 ON
Primary · CHW
→
Chillers
1/2 ON
ΔT 6.4 °C
→
CC Pumps
2/3 ON
1 in FAULT
→
Towers
2/2 ON
T2 low ΔT
Production cycle assets
| Asset | Type | Status | Mode | Metric · 30d | Hours 30d | Comp. 30d |
|---|---|---|---|---|---|---|
| Production · Chillers (2) — click to compare | ||||||
Chiller 1 Carrier 30HXC · 150 TR |
Chiller | ON | AUTO | ΔT 6.4 °C | 412 h | 88% |
Chiller 2 Carrier 30HXC · 150 TR |
Chiller | OFF | AUTO | — | 212 h | 84% |
| Hydraulics · Primary Pumps (CP) (3) — click to compare | ||||||
| BBA 1 CP | Primary pump | ON | AUTO | — | 512 h | 100% |
| BBA 2 CP | Primary pump | OFF | AUTO | — | 128 h | 100% |
| BBA 3 CP | Primary pump | ON | AUTO | — | 340 h | 100% |
| Hydraulics · Condenser Pumps (CC) (3) — click to compare | ||||||
| BBA 1 CC | Condenser pump | ON | AUTO | — | 412 h | 100% |
| BBA 2 CC | Condenser pump | FAULT | MAN | TF active | 88 h | 62% |
| BBA 3 CC | Condenser pump | ON | AUTO | — | 298 h | 100% |
| Heat Rejection · Towers (2) — click to compare | ||||||
Tower 1 (TE 1) BAC · 200 TR |
Cooling tower | ON | AUTO | ΔT 3.8 °C | 498 h | 76% |
Tower 2 (TE 2) BAC · 200 TR |
Cooling tower | ON | MAN | ΔT 3.1 °C | 312 h | 66% |
DETALLE
Chiller 1
· cooling production
Telemetry · Chiller 1
Usage pattern · day × hour
0%
100%
Pumps running
2/3
Current
2.1
Period average
Normal demand
≈ similar to prev. period
Availability
99.7%
Period
100%
Last 24h
Target ≥ 99%
▲ +0.3% vs prev. period
Usage balance
428h
Difference
CS1
Most used
Consider rotation
CS1: 524h · CS3: 96h
Auto Mode
3/3
in AUTO
100%
period time
No equipment in MANUAL
— stable
Secondary Pumps · distribution to building
| Pump | Status | Mode | Thermal fault | Period hours | % of usage | % AUTO period |
|---|---|---|---|---|---|---|
| Distribution · Secondary Pumps (CS) (3) — click to compare | ||||||
| BBA 1 CS | ON | AUTO | OK | 524 h | 56% | 100% |
| BBA 2 CS | ON | AUTO | OK | 320 h | 34% | 100% |
| BBA 3 CS | OFF | AUTO | OK | 96 h | 10% | 100% |
DETALLE
BBA 1 CS
· secondary pump
Telemetry · PMP 1 CS
Active alarms
3
Active now
1
Critical
1 critical · 2 warnings
Last: 18 min ago
Period events
47
Total · 30d
12
Critical
44 resolved · 3 active
▲ +8 vs prev. period
Downtime
14%
of the period
102h
accumulated
Average duration: 2.1h
Longest: 14.5h
Top equipment
BBA 2 CC
Most alarms
14
Events
Condenser pump
30% of total
Active now
Out-of-range parameters
FT BBA 2 CC
Thermal fault in condenser pump 2
Active for02h 14m
ΔT-LOW Tower 2
Tower 2 ΔT below critical band (3.1 °C < 4 °C)
Active for01h 02m
MANUAL TE 2
Tower 2 selector in MANUAL — automation disabled
Active for00h 18m
Period analysis
Equipment with most alarms
01
14
30%
02
10
21%
03
7
15%
04
6
13%
05
4
9%
06
3
6%
07
3
6%
Distribution by severity
47
Events
Critical
12 · 26%
Major
22 · 47%
Warning
13 · 28%
Heatmap · alarms raised by day×hour
0 events
5+ events
Full history
Alarm history
| Type | Equipment | Severity | Start | Close | Duration | Status |
|---|---|---|---|---|---|---|
| FT BBA 2 CC | BBA 2 CC | CRITICAL | 12 May · 12:18 | — | 02h 14m | ACTIVE |
| ΔT-LOW Tower 2 | Tower 2 | MAJOR | 12 May · 13:30 | — | 01h 02m | ACTIVE |
| MANUAL TE 2 | Tower 2 | WARNING | 12 May · 14:14 | — | 00h 18m | ACTIVE |
| SEQ-FAIL Chiller→Tower | Chiller 1 | CRITICAL | 11 May · 22:14 | 11 May · 22:48 | 00h 34m | CLEAREDACK |
| ΔT-LOW Tower 2 | Tower 2 | MAJOR | 11 May · 14:22 | 11 May · 18:55 | 04h 33m | CLEARED |
| FT BBA 2 CC | BBA 2 CC | CRITICAL | 10 May · 16:08 | 10 May · 17:42 | 01h 34m | CLEAREDACK |
| ΔT-LOW Chiller 2 | Chiller 2 | MAJOR | 10 May · 11:32 | 10 May · 12:18 | 00h 46m | CLEARED |
| SEQ-FAIL Chiller→CC | Chiller 1 | CRITICAL | 09 May · 08:15 | 09 May · 08:22 | 00h 07m | CLEARED |
| MANUAL BBA 2 CC | BBA 2 CC | WARNING | 08 May · 09:30 | 08 May · 14:12 | 04h 42m | CLEAREDACK |
| ΔT-LOW Tower 1 | Tower 1 | MAJOR | 07 May · 13:45 | 07 May · 16:30 | 02h 45m | CLEARED |
Showing 1–10 of 47 events
Sequence and mode status
Operating Sequences
01
Chiller → CP Pump
100%
02
Chiller → CC Pump
99%
03
Chiller → Tower
94%
04
CP → CS (distribution)
98%
05
Tower → CC
100%
06
System OFF Consistency
87%
Manual/Automatic Selectors
BBA 1 CPAUTO
BBA 2 CPAUTO
BBA 3 CPAUTO
BBA 1 CCAUTO
BBA 2 CCMAN
BBA 3 CCAUTO
BBA 1 CSAUTO
BBA 2 CSAUTO
BBA 3 CSAUTO
TE 1AUTO
TE 2MAN
VEX 16AUTO
VEX 17AUTO
% time all in AUTO · 30 days
91%